L5_Validation plan for generic BGC interface
This page should describe Validation Tests performed for this stand alone feature and should provide links to all the result pages.
Summary
Validation of the generic BGC interface will follow the validation tests of L6_Add phosphorus cycle.
Validation Test 1
Validation Test 1: run clm-bgc sub-model through interface
Date last modified:
Contributors: Gangsheng Wang (Unlicensed)
Provenance: (Run provenance Link, Code Tag, etc.)
Results: (link to results, data and plots)
The results should be BFB compared to ALM w/o interface and the most relevant variables (e.g., GPP, NPP, NEE, LAI, HR, vegetation/soil C/N/P pools) will be validated.
Validation Test 2
Validation Test 2: run pflotran-bgc through interface
Date last modified:
Contributors: Gangsheng Wang (Unlicensed)
Provenance: (Run provenance Link, Code Tag, etc.)
Results: (link to results, data and plots)
The results from ALM-pflotran coupled run are not required to be BFB as the pflotran-bgc module could be different from clm-bgc. However, we expect to obtain reasonable soil C/N/P pool sizes that are close to the clm-bgc results.
, multiple selections available,
Related content
L6_Validation plan for addition of phosphorus cycle
L6_Validation plan for addition of phosphorus cycle
More like this
L5_Design document for generic BGC interface
L5_Design document for generic BGC interface
More like this
L5_Verification for generic BGC interface
L5_Verification for generic BGC interface
More like this
L6_Verification for addition of phosphorus cycle
L6_Verification for addition of phosphorus cycle
More like this
L6_Design document for addition of phosphorus cycle
L6_Design document for addition of phosphorus cycle
More like this