L5_Verification for generic BGC interface
This page should describe Verification and Unit Tests performed for this stand alone feature and should provide links to all the result pages.
Summary
Three types of verification/unit testing will be performed to compare results among 3 scenarios:
- 3 types of verification:
(1) point-level ad_spinup run for 600 years.
(2) global-scale run for 20 years with saturated phosphorus supply
(3) global-scale run for 1 year without saturated phosphorus supply
- 3 scenarios:
(1) ACME master
(2) branch wanggangsheng/lnd/bgc-interface with 'clm_bgc_interface' & 'use_clm_bgc' being turned off
(3) branch wanggangsheng/lnd/bgc-interface with 'clm_bgc_interface' & 'use_clm_bgc' being turned on
All these verifications are expected to pass as bit-for-bit (BFB).
Verification Test 1
Verification Test 1: point-level ad_spinup run for 600 years
Date last modified:
Contributors: Gangsheng Wang (Unlicensed)
Provenance: (Run provenance Link, Code Tag, etc.)
Results: (link to results, data and plots)
Results are BFB.
Verification Test 2
Verification Test 2: global-scale run for 20 years with saturated phosphorus supply
Date last modified:
Contributors: Gangsheng Wang (Unlicensed)
Provenance: (Run provenance Link, Code Tag, etc.)
Results: (link to results, data and plots)
Results are BFB.
Verification Test 3
Verification Test 3: global-scale run for 1 year without saturated phosphorus supply
Date last modified:
Contributors: Gangsheng Wang (Unlicensed)
Provenance: (Run provenance Link, Code Tag, etc.)
Results: (link to results, data and plots)
Results are BFB.