L5_Verification for generic BGC interface

This page should describe Verification and Unit Tests performed for this stand alone feature and should provide links to all the result pages.

Summary

Three types of verification/unit testing will be performed to compare results among 3 scenarios:

  • 3 types of verification:

          (1) point-level ad_spinup run for 600 years.

          (2) global-scale run for 20 years with saturated phosphorus supply

          (3) global-scale run for 1 year without saturated phosphorus supply

  • 3 scenarios:
    (1) ACME master
    (2) branch wanggangsheng/lnd/bgc-interface with 'clm_bgc_interface' & 'use_clm_bgc' being turned off
    (3) branch wanggangsheng/lnd/bgc-interface with 'clm_bgc_interface' & 'use_clm_bgc' being turned on

All these verifications are expected to pass as bit-for-bit (BFB).

Verification Test 1

Verification Test 1: point-level ad_spinup run for 600 years

Date last modified: 

Contributors: Gangsheng Wang (Unlicensed)


Provenance: (Run provenance Link, Code Tag, etc.)

Results: (link to results, data and plots)

Results are BFB.

 

Verification Test 2

Verification Test 2: global-scale run for 20 years with saturated phosphorus supply

Date last modified: 

Contributors: Gangsheng Wang (Unlicensed)


Provenance: (Run provenance Link, Code Tag, etc.)

Results: (link to results, data and plots)

Results are BFB.

 

Verification Test 3

Verification Test 3: global-scale run for 1 year without saturated phosphorus supply

Date last modified: 

Contributors: Gangsheng Wang (Unlicensed)


Provenance: (Run provenance Link, Code Tag, etc.)

Results: (link to results, data and plots)

Results are BFB.

 

Related content

L5_Validation plan for generic BGC interface
L5_Validation plan for generic BGC interface
More like this
L5_Performance assessment for generic BGC interface
L5_Performance assessment for generic BGC interface
More like this
L5_Design document for generic BGC interface
L5_Design document for generic BGC interface
More like this
L6_Verification for addition of phosphorus cycle
L6_Verification for addition of phosphorus cycle
More like this
O_25_LI Land GLC Coupling Via CIME Verification Phase 1
O_25_LI Land GLC Coupling Via CIME Verification Phase 1
More like this