 The page consists of two tables... Click here to read more about the tables...

The first Dependencies Table provides information on features dependencies, lists expected Pull Request (PR) date (expected time this feature will be ready for integration), it also lists all the other known new code features that are blocking completion of this code. It lists all known features that depend on this feature being integrated. It also provides the date the PR was actually issued, the name of the integrator, the date the code was integrated and a hash/tag of the code integration into the ACME git repository. The information from this table feeds the overview table in the New Features Dependencies Overview page which is meant to be used by integrators to check the priority order in which the features should be integrated. It also provides an overview of all the new features and the expected integration dates. 

The second Checklist Table lists the code review steps to be taken in order. As you work on integrating your feature into ACME code, step along the Checklist table on your main page, obtain the approvals before going to the next step. For the phase 1 review, the Group Leads are the approvers, they can decide to sign on on the documentation or a verification step even if it is not completely finished, especially for the grandfathered features. The relevant documentation page does have to be created though and the explanation needs to be provided in Summary section as to why it is approved, what is the basis for approval. For example is there were tests performed on related feature and they proved indirectly that this feature works as expected, then the approver needs to document that. 

The Design Document page provides a description of the algorithms, implementation and planned testing including unit, verification, validation and performance testing. 

The Verification and Unit Testing page provides the short information and links to the tests that were performed, together with the links to the runs, their provenance and their results. The same information is called for in The Performance Assessment page and The Validation page in phase 1 of code review process. 

Dependencies Table for this feature

1.Design DocA8 Improvements to Aerosols and Clouds Design Document
2.OwnerHailong Wang
3.PR Ready 
4.Blocked By#
5.Affects #A3(interacts with CLUBB), A4 (interacts with UNICON), A9(interacts with surface models)
6.Issued PR 
7.PR AssigneeJin-Ho Yoon (Unlicensed), Balwinder Singh
8.Integrated 
9.Hash/Tag

1862319b87c7a0b973c8d40dd84946324ed68f1c

5caba47aa44ce7ccab8278dc351f620a689bc2c3

 a6332eb59ebef0e135eebf43093450a6507bd36b

f52c52f31850c430d6723c3d3394a0d6861471e9

 1823f1e200f65da02f98330863d9b108d07ae051

Git Branch

kaizhangpnl/atm/dcs-mods-clubbe

kaizhangpnl/atm/ic-mods-clubbe

singhbalwinder/atm/add-bc-pom-coarse-mode




Checklist for the Code Review Process for this feature

Action RequiredAssignee - Task OwnerLinkDone ?Done DateApproved?ApproverApproved DateNotes
Phase 1 - Component Level Development and Testing
Design DocumentHailong WangA8 Improvements to Aerosols and Clouds Design Document

(tick)

 
 

(tick)

(error)

Shaocheng Xie 
Verification and Unit Tests

Richard Easter (Unlicensed)

Kai Zhang

A8 Improvements to Aerosols and Clouds Verification Phase 1 (tick)(error)


Performance AssessmentRichard Easter (Unlicensed)

Kai Zhang

A8 Improvements to Aerosols and Clouds Performance Phase 1 (tick)(error)


Validation TestsRichard Easter (Unlicensed)

Kai Zhang

A8 Improvements to Aerosols and Clouds Validation Phase 1 (tick)(error)


Issue Pull RequestRichard Easter (Unlicensed)

Kai Zhang

 (tick) (error)


PR IntegratorJin-Ho Yoon (Unlicensed), Balwinder Singh, Susannah Burrows-
integrated date----
Phase 2 - Coupled System Integration and Testing
Phase 2 Process Doc(error)(error)

Feature's Coupled Performance(error)(error)


Feature's Coupled Validation(error)(error)


Final Approval to part of ACME model
(error)----