L1_VSFM
This page is a main, parent documentation page for the Variably Saturated Flow Model (VSFM) to be implemented in ALM v1.
Checklist for the Code Review Process for this feature
Action Require | Assignee - Task Owner | Link | Done ? | Done Date | Approved? | Approver | Approved Date | Notes |
---|---|---|---|---|---|---|---|---|
Phase 1 - Component Level Development and Testing | ||||||||
Design Document | L1_VSFM Design Doc |
| PT, WJR | PT, , WJR | ||||
Verification and Unit Tests | L1_VSFM Verification Phase 1 | ![]() | ![]() | |||||
Performance Assessment | L1_VSFM Performance Phase 1 | ![]() | ![]() | |||||
Validation Tests | L1_VSFM Validation Phase 1 | ![]() | ![]() | |||||
Issue Pull Request | PR #349, PR#366 | ![]() | ![]() | |||||
PR Integrator | - | ![]() | - | - | - | - | ||
Phase 2 - Coupled System Integration and Testing | ||||||||
Phase 2 Process Doc | ![]() | ![]() | ||||||
Feature's Coupled Performance | ![]() | ![]() | ||||||
Feature's Coupled Validation | ![]() | ![]() | ||||||
Final Approval to part of ACME model | ![]() | - | - | - | - |
, multiple selections available,
Related content
L1_VSFM Design Doc
L1_VSFM Design Doc
More like this
L2_BeTR Design Doc
L2_BeTR Design Doc
More like this
O_24_LI MPAS Land Ice in ACME
O_24_LI MPAS Land Ice in ACME
More like this
W7 – ZM with unrestricted launch level (ULL) Design Document
W7 – ZM with unrestricted launch level (ULL) Design Document
More like this
O_21_LI Third Party Support for MPAS-LI within ACME Design Document
O_21_LI Third Party Support for MPAS-LI within ACME Design Document
More like this
B5: Port iESM to E3SM Design Document
B5: Port iESM to E3SM Design Document
More like this