A1 Ozone Hole (Linoz-v2)
This page is a main, parent documentation page for this feature. The tables below provide links to all related documentation on this feature.
Checklist for the Code Review Process for this feature
Action Required | Assignee - Task Owner | Link | Done ? | Done Date | Approved? | Approver | Approved Date | Notes |
---|---|---|---|---|---|---|---|---|
Phase 1 - Component Level Development and Testing | ||||||||
Design Document | Philip Cameron-Smith (Unlicensed) | A1 Ozone Hole: Design Document | Shaocheng Xie | |||||
Verification and Unit Tests | Philip Cameron-Smith (Unlicensed) | A1 Ozone Hole: Verification Phase 1 | ![]() | Phil Rasch (pnl.gov) | ||||
Performance Assessment | Philip Cameron-Smith (Unlicensed) | A1 Ozone Hole: Performance Phase 1 | ![]() | ![]() | Shaocheng Xie | |||
Validation Tests | Philip Cameron-Smith (Unlicensed) | A1 Ozone Hole: Validation Phase 1 | ![]() | ![]() | Shaocheng Xie | |||
Issue Pull Request | Philip Cameron-Smith (Unlicensed) | #406 | ![]() | ![]() | Shaocheng Xie | |||
PR Integrator | Susannah Burrows | - | integrated date | - | - | - | - | |
Phase 2 - Coupled System Integration and Testing | ||||||||
Phase 2 Process Doc | ![]() | ![]() | ||||||
Feature's Coupled Performance | ![]() | ![]() | ||||||
Feature's Coupled Validation | ![]() | ![]() | ||||||
Final Approval to part of ACME model | ![]() | - | - | - | - |
Note: the design document for phase II is: W11: Atmospheric Chemistry and Radiation
, multiple selections available,
Related content
W15 O3v2
W15 O3v2
More like this
L2_BeTR
L2_BeTR
More like this
A2_subgridoro
A2_subgridoro
More like this
W11: Atmospheric Chemistry and Radiation
W11: Atmospheric Chemistry and Radiation
More like this
L4_Add topounits
L4_Add topounits
More like this
W1 - Gustiness
W1 - Gustiness
More like this