L3_CNP-ECA-Root_Leaf_Traits

This page is a main, parent documentation page for this feature. The tables below provide links to all related documentation on this feature. 

 The page consists of two tables... Click here to read more about the tables...

The first Dependencies Table provides information on features dependencies, lists expected Pull Request (PR) date (expected time this feature will be ready for integration), it also lists all the other known new code features that are blocking completion of this code. It lists all known features that depend on this feature being integrated for their work. It also provides the date the PR was actually issued, the name of the integrator and the date the code was integrated. The information from this table feeds the overview table in the New Features Dependencies Overview page which is meant to be used by integrators to check the priority order in which the features should be integrated. It also provides an overview of all the new features and the expected integration dates. 

The second Checklist Table lists the code review steps to be taken in order. As you work on integrating your feature into ACME code, step along the Checklist table on your main page, obtain the approvals before going to the next step. For the phase 1 review, the Group Leads are the approvers, they can decide to sign on on the documentation or a verification step even if it is not completely finished, especially for the grandfathered features. The relevant documentation page does have to be created though and the explanation needs to be provided in Summary section as to why it is approved, what is the basis for approval. For example is there were tests performed on related feature and they proved indirectly that this feature works as expected, then the approver needs to document that. 

The Design Document page provides a description of the algorithms, implementation and planned testing including unit, verification, validation and performance testing. 

The Verification and Unit Testing page provides the short information and links to the tests that were performed, together with the links to the runs, their provenance and their results. The same information is called for in The Performance Assessment page and The Validation page in phase 1 of code review process. 

Dependencies Table for this feature

1.Design DocL3_CNP-ECA-Root_Leaf_Traits Design Doc
2.Owner
3.PR Ready
 
4.Blocked By#
5.Affects #
6.Issued PR
 
7.PR Assignee
8.Integrated
 
9.Hash/Tagba5010ffc601408093af2d3a3583f3dadf643e28
Git Branchqzhu-lbl/lnd/leaf-cn-phys



Checklist for the Code Review Process for this feature

Action RequiredAssignee - Task OwnerLinkDone ?Done DateApproved?ApproverApproved DateNotes
Phase 1 - Component Level Development and Testing
Design DocumentL3_CNP-ECA-Root_Leaf_Traits Design Doc

(tick)

 
 

PT, WJR (tick)

PT, , WJR  
Verification and Unit TestsL3_CNP-ECA-Root_Leaf_Traits Verification Phase 1(error)(error)


Performance AssessmentL3_CNP-ECA-Root_Leaf_Traits Performance Phase 1(error)(error)


Validation TestsL3_CNP-ECA-Root_Leaf_Traits Validation Phase 1(error)(error)


Issue Pull RequestPR #393(warning)
 
(error)


PR Integratorassigned integrator-
integrated date----
Phase 2 - Coupled System Integration and Testing
Phase 2 Process Doc(error)(error)

Feature's Coupled Performance(error)(error)


Feature's Coupled Validation(error)(error)


Final Approval to part of ACME model
(error)----