B2 Mosart Heat Performance Phase 1

This page should describe Performance Assessment Tests performed for this stand alone feature and should provide links to all the result pages.

Summary

Short summary of what was done and what was the result.


Performance Test 1

Performance Test 1: Testing ELM-MOSART-heat on Constance

Date last modified: June 30, 2019

Contributors: Hongyi Li

Provenance: (Run provenance Link, Code Tag, etc:)

Results: (link to results, data and plots)


ELM-MOSART-heat has been run globally w/o water management option on Constance using 144 cores during a historical period 1972-2004. The total running time is ~47 hours with the water management option, and is ~45 hours without it. 


Performance Test 2

Performance Test 2: short-desciption-of-testing-here

Date last modified:

Contributors: (add your name to this list if it does not appear)


Provenance: (Run provenance Link, Code Tag, etc:)

Results: (link to results, data and plots)


How was XXX be tested? i.e. how do we know when we have met requirement XXX. Will these unit tests be included in the ongoing going forward?

Related content

B2 Mosart Heat Design Document
B2 Mosart Heat Design Document
More like this
B3 Mosart Sediment Performance Phase 1
B3 Mosart Sediment Performance Phase 1
More like this
L10 Performance Assessment: MOSART One-way Coupling
L10 Performance Assessment: MOSART One-way Coupling
More like this
L9_UQ_Framework Performance assessment phase 1
L9_UQ_Framework Performance assessment phase 1
More like this
O_26_LI Add Land Ice Meshes to ACME Performance Phase 1
O_26_LI Add Land Ice Meshes to ACME Performance Phase 1
More like this
L7_UQ_efficiency_improvements Verification phase 1
L7_UQ_efficiency_improvements Verification phase 1
More like this