B8 Variable soil thickness in CTC
This page is a main, parent documentation page for this feature. The tables below provide links to all related documentation on this feature.
Checklist for the Code Review Process for this feature
Action Required | Assignee - Task Owner | Link | Done ? | Done Date | Approved? | Approver | Approved Date | Notes |
---|---|---|---|---|---|---|---|---|
Phase 1 - Component Level Development and Testing | ||||||||
Design Document | Michael Brunke | B8 Variable soil thickness in CTC Design Document | ![]() | 18 March 2020 | Katherine Calvin (Unlicensed) | |||
Verification and Unit Tests | Michael Brunke | B8 Variable soil thickness in CTC Verification Phase 1 | ![]() | 27 April 2020 | ![]() | Katherine Calvin (Unlicensed) | ||
Performance Assessment | Michael Brunke | B8 Variable soil thickness in CTC Performance | ![]() | 27 April 2020 | ![]() | Katherine Calvin (Unlicensed) | ||
Validation Tests | Michael Brunke | B8 Variable soil thickness in CTC Validation | ![]() | 21 August 2020 | ![]() | Katherine Calvin (Unlicensed) | ||
Issue Pull Request | Michael Brunke | #3609 | ![]() | 24 August 2020 | ![]() | |||
PR Integrator | assigned integrator | - | integrated date | - | - | - | - | |
Phase 2 - Coupled System Integration and Testing | ||||||||
Phase 2 Process Doc | ![]() | ![]() | ||||||
Feature's Coupled Performance | ![]() | ![]() | ||||||
Feature's Coupled Validation | ![]() | ![]() | ||||||
Final Approval to part of ACME model | ![]() | - | - | - | - |
Related content
B1_Soil Erosion
B1_Soil Erosion
More like this
L8 Topographic Downscaling (land side)
L8 Topographic Downscaling (land side)
More like this
B8 Variable soil thickness in CTC Design Document
B8 Variable soil thickness in CTC Design Document
More like this
B4_Crop Plant Date
B4_Crop Plant Date
More like this
L13: ELMv1-CTC-CNP updates used in Land-BGC Intercomparison
L13: ELMv1-CTC-CNP updates used in Land-BGC Intercomparison
More like this
B3_Mosart-sediment
B3_Mosart-sediment
More like this