B8 Variable soil thickness in CTC
This page is a main, parent documentation page for this feature. The tables below provide links to all related documentation on this feature.
Checklist for the Code Review Process for this feature
Action Required | Assignee - Task Owner | Link | Done ? | Done Date | Approved? | Approver | Approved Date | Notes |
---|---|---|---|---|---|---|---|---|
Phase 1 - Component Level Development and Testing | ||||||||
Design Document | Michael Brunke | B8 Variable soil thickness in CTC Design Document | 18 March 2020 | Katherine Calvin (Unlicensed) | ||||
Verification and Unit Tests | Michael Brunke | B8 Variable soil thickness in CTC Verification Phase 1 | 27 April 2020 | Katherine Calvin (Unlicensed) | ||||
Performance Assessment | Michael Brunke | B8 Variable soil thickness in CTC Performance | 27 April 2020 | Katherine Calvin (Unlicensed) | ||||
Validation Tests | Michael Brunke | B8 Variable soil thickness in CTC Validation | 21 August 2020 | Katherine Calvin (Unlicensed) | ||||
Issue Pull Request | Michael Brunke | #3609 | 24 August 2020 | |||||
PR Integrator | assigned integrator | - | integrated date | - | - | - | - | |
Phase 2 - Coupled System Integration and Testing | ||||||||
Phase 2 Process Doc | ||||||||
Feature's Coupled Performance | ||||||||
Feature's Coupled Validation | ||||||||
Final Approval to part of ACME model | - | - | - | - |