B2_Mosart-heat
This page is a main, parent documentation page for this feature. The tables below provide links to all related documentation on this feature.
Checklist for the Code Review Process for this feature
Action Required | Assignee - Task Owner | Link | Done ? | Done Date | Approved? | Approver | Approved Date | Notes |
---|---|---|---|---|---|---|---|---|
Phase 1 - Component Level Development and Testing | ||||||||
Design Document | Sep. 3, 2019 | Katherine Calvin (Unlicensed) | ||||||
Verification and Unit Tests | B2 Mosart Heat Verification Phase 1 | ![]() | Aug. 15, 2019 | ![]() | ||||
Performance Assessment | ![]() | Aug. 15, 2019 | ![]() | |||||
Validation Tests | ![]() | ![]() | Katherine Calvin (Unlicensed) | |||||
Issue Pull Request | Hongyi Li | #3033 | ![]() | Aug., 15, 2019 | ![]() | |||
PR Integrator | assigned integrator | - | integrated date | - | - | - | - | |
Phase 2 - Coupled System Integration and Testing | ||||||||
Phase 2 Process Doc | ![]() | ![]() | ||||||
Feature's Coupled Performance | ![]() | ![]() | ||||||
Feature's Coupled Validation | ![]() | ![]() | ||||||
Final Approval to part of ACME model | ![]() | - | - | - | - |
Related content
B3_Mosart-sediment
B3_Mosart-sediment
More like this
Checklist for v2 Developments
Checklist for v2 Developments
Read with this
W15 O3v2
W15 O3v2
More like this
B2 Mosart Heat Design Document
B2 Mosart Heat Design Document
Read with this
L2_BeTR
L2_BeTR
More like this
B6 - Plant Hydraulics
B6 - Plant Hydraulics
Read with this