W13: Linoz Diagnostics
W13: Linoz Diagnostics
This page is a main, parent documentation page for this feature. The tables below provide links to all related documentation on this feature.
Checklist for the Code Review Process for this feature
Action Required | Assignee - Task Owner | Link | Done ? | Done Date | Approved? | Approver | Approved Date | Notes |
---|---|---|---|---|---|---|---|---|
Phase 1 - Component Level Development and Testing | ||||||||
Design Document | W13: Linoz Diagnostics Design Document | |||||||
Verification and Unit Tests | Philip Cameron-Smith (Unlicensed) & Michael J Prather | W13: Verification for Linoz Diagnostics | ||||||
Performance Assessment | Philip Cameron-Smith (Unlicensed) & Michael J Prather | W13: Performance Assessment for Linoz Diagnostics | ||||||
Validation Tests | W13: Linoz Diagnostics Validation Phase 1 | |||||||
Issue Pull Request | ||||||||
PR Integrator | - | |||||||
Phase 2 - Coupled System Integration and Testing | ||||||||
Phase 2 Process Doc | ![]() | ![]() | ||||||
Feature's Coupled Performance | ![]() | ![]() | ||||||
Feature's Coupled Validation | ![]() | ![]() | ||||||
Final Approval to part of ACME model | ![]() | - | - | - | - |
For reference, the design document for Linoz is: A1 Ozone Hole (Linoz-v2)
, multiple selections available,