B6 - Plant Hydraulics Performance Phase 1

This page should describe Performance Assessment Tests performed for this stand alone feature and should provide links to all the result pages.

Summary

  • A two-year long simulation was performed with ELM+PHS. The test was performed on COMPY using compset ICLM45 and grid resolution ne30_oEC.
  • Simulation was completed with no numerical issues.

Performance Test 1

Performance Test 1: Two-year long simulation with ELM+PHS

Date last modified:

Contributors: (add your name to this list if it does not appear)

Provenance: (Run provenance Link, Code Tag, etc:)

  • Test ran on COMPY
  • Run length = 2 years
  • Number of MPI Tasks = 128
  • Number of threads = 1
  • Hydrology model : Default ELM v0 model

Results: (link to results, data and plots)


Available on COMPY in file /compyfs/d3m045/global_run_clmphs_review/ICLM45/timing/e3sm_timing.ICLM45.1243.190627-160438

TOT Run Time3459.374 seconds4.739 seconds/mday49.95 myears/wday
CPL Run Time446.780 seconds0.612 seconds/mday386.77 myears/wday
ATM Run Time376.393 seconds0.516 seconds/mday459.09 myears/wday
LND Run Time2079.490 seconds2.849 seconds/mday83.10 myears/wday
ROF Run Time213.133 seconds0.292 seconds/mday810.76 myears/wday
CPL COMM Time1370.002 seconds1.877 seconds/mday126.13 myears/wday

: