B6 - Plant Hydraulics Performance Phase 1
This page should describe Performance Assessment Tests performed for this stand alone feature and should provide links to all the result pages.
Summary
- A two-year long simulation was performed with ELM+PHS. The test was performed on COMPY using compset ICLM45 and grid resolution ne30_oEC.
- Simulation was completed with no numerical issues.
Performance Test 1
Performance Test 1: Two-year long simulation with ELM+PHS
Date last modified:
Contributors: (add your name to this list if it does not appear)
Provenance: (Run provenance Link, Code Tag, etc:)
- Test ran on COMPY
- Run length = 2 years
- Number of MPI Tasks = 128
- Number of threads = 1
- Hydrology model : Default ELM v0 model
Results: (link to results, data and plots)
Available on COMPY in file /compyfs/d3m045/global_run_clmphs_review/ICLM45/timing/e3sm_timing.ICLM45.1243.190627-160438
TOT Run Time | 3459.374 seconds | 4.739 seconds/mday | 49.95 myears/wday |
CPL Run Time | 446.780 seconds | 0.612 seconds/mday | 386.77 myears/wday |
ATM Run Time | 376.393 seconds | 0.516 seconds/mday | 459.09 myears/wday |
LND Run Time | 2079.490 seconds | 2.849 seconds/mday | 83.10 myears/wday |
ROF Run Time | 213.133 seconds | 0.292 seconds/mday | 810.76 myears/wday |
CPL COMM Time | 1370.002 seconds | 1.877 seconds/mday | 126.13 myears/wday |
: