B5 Port iESM to E3SM: Performance Assessment
This page should describe Performance Assessment Tests performed for this stand alone feature and should provide links to all the result pages.
Summary
Performance testing was done with a short GCAM-ELM simulation.
Performance Test 1
Performance Test 1: Increase in run time for ELM-GCAM coupled simulation at 1 degree
Date last modified:
Contributors: Tim Shippert (Unlicensed)
Provenance:
Results:
Compset | Processor count | minutes per simulated year | simulated years per wall-clock day | minutes to initialize |
---|---|---|---|---|
ELM only | ||||
GCAM+ELM |
Note that GCAM only runs once every year, so the increase in runtime for short tests (days to months) is not representative of the total increase in runtime for longer tests (increase is additive not multiplicative).