Transitioning from MPAS-O and to OMEGA

  • The E3SM project will place MPAS-O into maintenance only following the finalization of v3.1 (roughly August 2025).

  • Bandwidth of the E3SM project is limited and it is not possible to be responsible for the support of new features developed by ecosystem projects.

Proposed plan

 

Related content

Running E3SM: step-by-step guide
Running E3SM: step-by-step guide
Read with this
Omega Group Breakouts: 2023-06
Omega Group Breakouts: 2023-06
More like this
Agenda: 2024 E3SM Tutorial Workshop
Agenda: 2024 E3SM Tutorial Workshop
Read with this