This page is a main, parent documentation page for this feature. The tables below provide links to all related documentation on this feature.
Checklist for the Code Review Process for this feature
Action Required | Assignee - Task Owner | Link | Done ? | Done Date | Approved? | Approver | Approved Date | Notes |
---|---|---|---|---|---|---|---|---|
Phase 1 - Component Level Development and Testing | ||||||||
Design Document | Hailong Wang | A13 Interactions With Surface Models - Aerosol Interactions with Ice Design Document | | Shaocheng Xie | ||||
Verification and Unit Tests | Hailong Wang | A13 Interactions With Surface Models - Aerosol Interactions with Ice Verification Phase 1 | ||||||
Performance Assessment | Hailong Wang | A13 Interactions With Surface Models - Aerosol Interactions with Ice Performance Phase 1 | ||||||
Validation Tests | Hailong Wang | A13 Interactions With Surface Models - Aerosol Interactions with Ice Validation Phase 1 | ||||||
Issue Pull Request | Hailong Wang | PR #417 | ||||||
PR Integrator | Susannah Burrows | - | integrated date | - | - | - | - | |
Phase 2 - Coupled System Integration and Testing | ||||||||
Phase 2 Process Doc | ||||||||
Feature's Coupled Performance | ||||||||
Feature's Coupled Validation | ||||||||
Final Approval to part of ACME model | - | - | - | - |