Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

This page is a main, parent documentation page for this feature. The tables below provide links to all related documentation on this feature. 

...

Page Properties
idfeature

Dependencies Table for this feature

1.Design DocPhysics Grid
2.OwnerAndrew Bradley Oksana Guba Walter Hannah Mark Taylor
3.PR Ready
4.Blocked By#
5.Affects #
PR Approved ByWalter Hannah
Date Approved26 Aug 2019
6.Issued PRPR 3141
7.PR AssigneeOksana Guba
8.Integrated10 Sep 2019
9.Hash/Taghttps://github.com/E3SM-Project/E3SM/commit/89764c0561f72c552dca03b493b565c2c2cd8b31
10.Git Branch


...

Action RequiredAssignee - Task OwnerLinkDone ?Done DateApproved?ApproverApproved DateNotes
Phase 1 - Component Level Development and Testing
Design DocumentAndrew Bradley

W16 Physics Grid Design Document

(error)

 (tick)
  

(error)

Verification and Unit TestsAndrew Bradley

W16 Physics Grid Verification Phase 1

(error)

(tick) (error)


Performance AssessmentAndrew Bradley

W16 Physics Grid Performance Phase 1

(error)

(tick) (error)


Validation TestsAndrew Bradley

W16 Physics Grid Validation Phase 1

(error)

(tick) (error)


Issue Pull RequestAndrew Bradley(error)(error)


PR Integratorassigned integrator-
integrated date----
Phase 2 - Coupled System Integration and Testing
Phase 2 Process Doc(error)(error)

Feature's Coupled Performance(error)(error)


Feature's Coupled Validation(error)(error)


Final Approval to part of ACME model
(error)----

...