This page should describe Performance Assessment Tests performed for this stand alone feature and should provide links to all the result pages.
Table of Contents
Summary
A two-year long simulation was performed with ELM+PHS. The test was performed on constance COMPY using compset ICLne30_oECM45ED compset ICLM45 and grid resolution ne30_oEC.
Simulation was completed with no numerical issues.
Performance Test 1
Performance Test 1: Two-year long simulation with ELM+PHS
Date last modified:
...
Contributors: (add your name to this list if it does not appear)
Provenance: (Run provenance Link, Code Tag, etc:)
Test ran on compyCOMPY
Run length = 2 years
Number of MPI Tasks = 128
Number of threads = 1
Hydrology model : Default ELM v0 model
Results: (link to results, data and plots)
Available on COMPY in file /compyfs/d3m045/global_run_clmphs_review/ICLM45/timing/e3sm_timing.ICLM45.1243.190627-160438
TOT Run Time
:
3459.374 seconds
4.739 seconds/mday
49.95 myears/wday
CPL Run Time
:
446.780 seconds
0.612 seconds/mday
386.77 myears/wday
ATM Run Time
:
376.393 seconds
0.516 seconds/mday
459.09 myears/wday
LND Run Time
:
2079.490 seconds
2.849 seconds/mday
83.10 myears/wday
ICE
ROF Run Time
: 0.000 seconds 0.000 seconds/mday 0.00 myears/wdayROF Run Time:
OCN Run Time: 0.000 seconds 0.000 seconds/mday 0.00 myears/wday
213.133 seconds
0.292 seconds/mday
810.76
myears/wday
GLC Run Time: 0.000 seconds 0.000 seconds/mday 0.00 myears/wday
WAV Run Time: 0.000 seconds 0.000 seconds/mday 0.00 myears/wday
IAC Run Time: 0.000 seconds 0.000 seconds/mday 0.00 myears/wday
ESP Run Time: 0.000 seconds 0.000 seconds/mday 0.00
myears/wday
CPL COMM Time
:
1370.002 seconds
1.877 seconds/mday
126.13 myears/wday
Performance Test 2
Performance Test 2: short-desciption-of-testing-here
Date last modified:
Contributors: (add your name to this list if it does not appear)
Provenance: (Run provenance Link, Code Tag, etc:)
Results: (link to results, data and plots)
How was XXX be tested? i.e. how do we know when we have met requirement XXX. Will these unit tests be included in the ongoing going forward?