Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Page Properties
idfeature

Dependencies Table for this feature

1.Design DocA13 Interactions With Surface Models - Aerosol Interactions with Ice Design Document
2.OwnerHailong Wang
3.PR Ready 
4.Blocked By#
5.Affects #
6.Issued PR 
7.PR OwnerBalwinder Singh
8.Integrated
9.Hash/Tag
Git Branchhwangacme/atm-clm-cice/aerosol_snow_ice_after_cime


HTML Comment

Labels to choose from for the 'Done ?' and 'Approved ?' columns

(tick) - competed, (warning) - in progress, (error) - not done/not started

...

Action RequiredAssignee - Task OwnerLinkDone ?Done DateApproved?ApproverApproved DateNotes
Phase 1 - Component Level Development and Testing
Design DocumentHailong WangA13 Interactions With Surface Models - Aerosol Interactions with Ice Design Document

(tick)

 
 

(tick)

Shaocheng Xie 
Verification and Unit TestsHailong WangA13 Interactions With Surface Models - Aerosol Interactions with Ice Verification Phase 1(error)(tick)(error)   
Performance AssessmentHailong WangA13 Interactions With Surface Models - Aerosol Interactions with Ice Performance Phase 1(error)(tick)(error)   
Validation TestsHailong WangA13 Interactions With Surface Models - Aerosol Interactions with Ice Validation Phase 1(error)(tick)(error)   
Issue Pull Request(error)Hailong Wang(tick) (error)   
PR Integratorassigned integratorBalwinder Singh- integrated date----
Phase 2 - Coupled System Integration and Testing
Phase 2 Process Doc(error)(error)  
Feature's Coupled Performance(error)(error)   
Feature's Coupled Validation(error)(error)   
Final Approval to part of ACME model (error)----

...