Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. BGC-v1 ssp585 cases Cmorize and publish to CMIP (publish now) AND to E3SM project

  2. DECK-v1 future scenarios Cmorize and publish to CMIP AND to E3SM project (pending on paper submission): Note 3 ensembles of GHG-only simulations in SSP585 scenario are not part of CMIP6, will only be published to E3SM project.

  3. HR-v1 21year high-volume output 1950-control continuation run to E3SM project (publish now?)

  4. HR-v1 regular-volume output 1950-control continuation run to E3SM project(was put on pause to prioritize the unc11 (transient run))

...