Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

The Design Document page provides a description of the algorithms, implementation and planned testing including unit, verification, validation and performance testing. Please read  Step 1.3 Performance Expectations that explains feature documentation requirements from the performance group point of view. 

Design Document

 Click here for instructions to fill up the table below ......

The first table in Design Document gives overview of this document, from this info the Design Documents Overview page is automatically created.

In the overview table below 4.Equ means Equations and Algorithms, 5.Ver means Verification, 6.Perf - Performance, 7. Val - Validation

  • Equations: Document the equations that are being solved and describe algorithms
  • Verification Plans: Define tests that will be run to show that implementation is correct and robust. Involve unit tests to cover range of inputs as well as benchmarks.
  • Performance expectations: Explain the expected performance impact from this development
  • Validation Plans: Document what process-based, stand-alone component, and coupled model runs will be performed, and with what metrics will be used to assess validity

Use the symbols below (copy and paste) to indicate if the section is in progress or done or not started.

In the table below 4.Equ means Equations and Algorithms, 5.Ver means Verification, 6.Perf - Performance, 7. Val - Validation,   (tick) - competed, (warning) - in progress, (error) - not done

Overview table for the owner and an approver of this feature

1.Description

Lake water storage in ELM
2.OwnerMichael Brunke
3.Created30 August 2021
4.Equ(error)
5.Ver(error)
6.Perf(error)
7.Val(error)
8.Approver
9.Approved Date
 Click here for Table of Contents ...

Table of Contents



Title: Some descriptive title

Requirements and Design

E3SM BGC Group

Date: 30 August 2021

Summary

The purpose of this section is to summarize what capability is to be added to the E3SM  through this design process. It should be clear what new code will do that the current code does not. Summarizing the primary challenges with respect to software design and implementation is also appropriate for this section. Finally, this statement should contain general statement with regard to what is “success.”


Requirements


Requirement: Eliminate negative runoffs in ELM

Date last modified: 30 August 2021  
Contributors: Michael Brunke


ELM generates negative runoffs, especially in the tri-grid configuration.  This is coming from the QRGWL, the combined runoff from glaciers, wetlands, and lakes.  This goes negative periodically to maintain these features.  Figure 1 shows that most of the grid cells generating negative total runoff (blue in panel (a)) occur in areas with lake fraction > ~5%.

Algorithmic Formulations

Design solution: Add lake water storage

Date last modified:// date 
Contributors: (add your name to this list if it does not appear)


For each requirement, there is a design solution that is intended to meet that requirement. Design solutions can include detailed technical discussions of PDEs, algorithms, solvers and similar, as well as technical discussion of performance issues. In general, this section should steer away from a detailed discussion of low-level software issues such as variable declarations, interfaces and sequencing.


Design and Implementation

Implementation: Verification of lake water storage

Date last modified: 30 August 2021
Contributors: Michael Brunke


Figure 1b shows the total runoff from a test run including lake water storage.  The negative runoff from the grid cells with lakes is eliminated.  The only negative runoff left is from grid cells containing glaciers.


Planned Verification and Unit Testing 

Verification and Unit Testing: short-desciption-of-testing-here

Date last modified:  
Contributors: (add your name to this list if it does not appear)


How will XXX be tested? i.e. how will be we know when we have met requirement XXX. Will these unit tests be included in the ongoing going forward?

Planned Validation Testing 

Validation Testing: short-desciption-of-testing-here

Date last modified:
Contributors: (add your name to this list if it does not appear)


How will XXX be tested? What observational or other dataset will be used?  i.e. how will be we know when we have met requirement XXX. Will these unit tests be included in the ongoing going forward?

Planned Performance Testing 

Performance Testing: short-desciption-of-testing-here

Date last modified:
Contributors: (add your name to this list if it does not appear)


How will XXX be tested? i.e. how will be we know when we have met requirement XXX. Will these unit tests be included in the ongoing going forward?







  • No labels