Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Action RequiredAssignee - Task OwnerLinkDone ?Done DateApproved?ApproverApproved DateNotes
Phase 1 - Component Level Development and Testing
Design DocumentZeli Tan

B1_Soil Erosion B2 Mosart Heat Design Document

(error)

 

(error)

Verification and Unit TestsZeli Tan

B1_Soil Erosion B2 Mosart Heat Verification Phase 1


(error)(error)


Performance AssessmentZeli Tan

B1_Soil Erosion B2 Mosart Heat Performance Phase 1

(error)(error)


Validation TestsZeli Tan

B1_Soil Erosion B2 Mosart Heat Validation Phase 1

(tick) (error)


Issue Pull Request(error)(error)


PR Integratorassigned integrator-
integrated date----
Phase 2 - Coupled System Integration and Testing
Phase 2 Process Doc(error)(error)

Feature's Coupled Performance(error)(error)


Feature's Coupled Validation(error)(error)


Final Approval to part of ACME model
(error)----

...