Action Required | Assignee - Task Owner | Link | Done ? | Done Date | Approved? | Approver | Approved Date | Notes | |
---|---|---|---|---|---|---|---|---|---|
Phase 1 - Component Level Development and Testing | |||||||||
Design Document | Philip Cameron-Smith (Unlicensed) | A1 Ozone Hole: Design Document |
| Shaocheng Xie | |||||
Verification and Unit Tests | Philip Cameron-Smith (Unlicensed) | A1 Ozone Hole: Verification Phase 1 |
| Phil Rasch (pnl.gov) | |||||
Performance Assessment | Philip Cameron-Smith (Unlicensed) | A1 Ozone Hole: Performance Phase 1 | Shaocheng Xie | ||||||
Validation Tests | Philip Cameron-Smith (Unlicensed) | A1 Ozone Hole: Validation Phase 1 | Shaocheng Xie | ||||||
Issue Pull Request | Philip Cameron-Smith (Unlicensed) | #406 | Shaocheng Xie | ||||||
PR Integrator | Susannah Burrows | - | integrated date | - | - | - | - | ||
Phase 2 - Coupled System Integration and Testing | |||||||||
Phase 2 Process Doc | |||||||||
Feature's Coupled Performance | |||||||||
Feature's Coupled Validation | |||||||||
Final Approval to part of ACME model | - | - | - | - |
...