Abstract: There is a small task out of LLNL LDRD-SI ``Climate Resilience for National Security’’ — we are curious if we can run SCREAM RRM at 100m. However, the existing USGS cubed topo is all in 3 km processed from the USGS GTOPO30 30 arch-second (1 km) source DEM (10.5194/gmd-8-3975-2015). Therefore, we need to generate new cubed topo using ultra-high resolution source DEM data. Some of us are interested in the process of generating new global uniform cubed topo used for whatever new grids with dx < 3 km @MarkT Mark Taylor, @PeterB Peter Bogenschutz, @Jishi Jishi Zhang. Specifically, this page documents the practice on LC of generating 800m cubed topo using 500m / 250m USGS GMTED2010 source DEM dataset.

...