Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Action RequiredAssignee - Task OwnerLinkDone ?Done DateApproved?ApproverApproved DateNotes
Phase 1 - Component Level Development and Testing
Design DocumentPhilip Cameron-Smith (Unlicensed)A1 Ozone Hole: Design Document

(tick)

  

Shaocheng Xie

(tick)

 
Verification and Unit TestsPhilip Cameron-Smith (Unlicensed)A1 Ozone Hole: Verification Phase 1(tick) (error)

(tick)

Phil Rasch (pnl.gov)

   
Performance AssessmentPhilip Cameron-Smith (Unlicensed) A1 Ozone Hole: Performance Phase 1(tick) (error)   
Validation TestsPhilip Cameron-Smith (Unlicensed) A1 Ozone Hole: Validation Phase 1(tick) (error)   
Issue Pull RequestPhilip Cameron-Smith (Unlicensed)#406(tick) (error)   
PR IntegratorSusannah Burrows- integrated date----
Phase 2 - Coupled System Integration and Testing
Phase 2 Process Doc(error)(error)  
Feature's Coupled Performance(error)(error)   
Feature's Coupled Validation(error)(error)   
Final Approval to part of ACME model (error)----

...