Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Action RequiredAssignee - Task OwnerLinkDone ?Done DateApproved?ApproverApproved DateNotes
Phase 1 - Component Level Development and Testing
Design Document -marine BGCSusannah BurrowsA9 Interactions With Surface Models Design Document

(warning)

 

(error)

Design document - surface atmospheric aerosol interactions with surface snow and iceHailong WangA9 Interactions With Surface Models Design Document - Aerosol Interactions with Ice(warning)(tick)     
Verification and Unit TestsA9 Interactions With Surface Models Verification Phase 1(error)(error)   
Performance AssessmentA9 Interactions With Surface Models Performance Phase 1(error)(error)   
Validation TestsA9 Interactions With Surface Models Validation Phase 1(error)(error)   
Issue Pull Request(error)(error)   
PR Integratorassigned integrator- integrated date----
Phase 2 - Coupled System Integration and Testing
Phase 2 Process Doc(error)(error)  
Feature's Coupled Performance(error)(error)   
Feature's Coupled Validation(error)(error)   
Final Approval to part of ACME model (error)----

...