This page should describe Verification and Unit Tests performed for this stand alone feature and should provide links to all the result pages.
Table of Contents |
---|
Summary
Short summary of what was done and what was the result.
Unit Testing
Unit Testing: short-desciption-of-testing-here
Date last modified:
Contributors:(add your name to this list if it does not appear)
Three types of verification/unit testing will be performed to compare results among 3 scenarios:
- 3 types of verification:
(1) point-level ad_spinup run for 600 years.
(2) global-scale run for 20 years with saturated phosphorus supply
(3) global-scale run for 1 year without saturated phosphorus supply
- 3 scenarios:
(1) ACME master
(2) branch wanggangsheng/lnd/bgc-interface with 'clm_bgc_interface' & 'use_clm_bgc' being turned off
(3) branch wanggangsheng/lnd/bgc-interface with 'clm_bgc_interface' & 'use_clm_bgc' being turned on
All these verifications are expected to pass as bit-for-bit (BFB).
Verification Test 1
Verification Test 1: point-level ad_spinup run for 600 years
Date last modified:
Contributors: Gangsheng Wang (Unlicensed)
Provenance: (Run provenance Link, Code Tag, etc
...
.)
Results: (link to results, data and plots)
Results are bit-for-bit (BFB).
Verification Test 2: global-scale run for 20 years with saturated phosphorus supply
Date last modified:
...
How was XXX be tested? i.e. how do we know when we have met requirement XXX. Will these unit tests be included in the ongoing going forward?
Verification Test 1
...
Contributors: Gangsheng Wang (Unlicensed)
Provenance: (Run provenance Link, Code Tag, etc.)
Results: (link to results, data and plots)
Results are bit-for-bit (BFB).
Verification Test 3: global-scale run for 1 year without saturated phosphorus supply
Date last modified:
Contributors:
...
Gangsheng Wang (Unlicensed)
Provenance: (Run provenance Link, Code Tag, etc.)
Results: (link to results, data and plots)
Results are bit-for-bit (BFB).
How was XXX be tested? i.e. how do we know when we have met requirement XXX. Will these unit tests be included in the ongoing going forward?