Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...


(error)
Action RequiredAssignee - Task OwnerLinkDone ?Done DateApproved?ApproverApproved DateNotes
Phase 1 - Component Level Development and Testing
Design DocumentNicole JefferyB13 Generalize MPAS-SI Algal Grazing for Multiple Algal Groups: Design Document

(tick)


11/03/2020

(tick)

Katherine Calvin (Unlicensed) 
Verification and Unit TestsNicole JefferyB13 MPAS-SI algal grazing: Verification(tick) (error)


Performance Assessment@ name - a person assigned to create performance testing results pageNicole JefferyB13 MPAS-SI algal grazing: Timings(tick) (error)


Validation Tests(error)(error)


Issue Pull Request(error)(error)


PR Integratorassigned integrator-
integrated date----
Phase 2 - Coupled System Integration and Testing
Phase 2 Process Doc(error)(error)

Feature's Coupled Performance(error)(error)


Feature's Coupled Validation(error)(error)


Final Approval to part of ACME model
(error)----