Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...


Action RequiredAssignee - Task OwnerLinkDone ?Done DateApproved?ApproverApproved DateNotes
Phase 1 - Component Level Development and Testing
Design DocumentMichael BrunkeB8 Variable soil thickness in CTC Design Document(tick)18 March 2020 

(error)

Verification and Unit TestsMichael Brunke(error)B8 Variable soil thickness in CTC Verification Phase 1(tick)2 April 2020(error)


Performance AssessmentMichael Brunke(error)(error)


Validation TestsMichael Brunke(error)(error)


Issue Pull RequestMichael Brunke(error)(error)


PR Integratorassigned integrator-
integrated date----
Phase 2 - Coupled System Integration and Testing
Phase 2 Process Doc(error)(error)

Feature's Coupled Performance(error)(error)


Feature's Coupled Validation(error)(error)


Final Approval to part of ACME model
(error)----