Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Planned Validation Testing 

Validation Testing:

...

Compset FC5AV1C-L was used with ne3_ne30 grid to validate CLUBB version 2 model

Date last modified: 27 Jun 2019
Contributors: Vince Larson, Balwinder Singh

...

Test Vs. OBS

Control Vs. OBS


The history files are at (HPSS NERSC): A:/home/b/bsingh/SMS.ne30_ne30.FC5AV1C-L.anvil_intel.clbv2_rbsd_1_ed716943a4c.tar and  A:/home/b/bsingh/SMS.ne30_ne30.FC5AV1C-L.anvil_intel.def_mstr_b5aaa6b7d228_clbv2_rbsd_1.tar

These files are archived as "tar" using HTAR.

Climo files: Climo files are inside the tar archive at: <test case name>/run/climo_fv/2-6yr/. For example: "SMS.ne30_ne30.FC5AV1C-L.anvil_intel.clbv2_rbsd_1_ed716943a4c/run/climo_fv/2-6yr/"

Planned Performance Testing 

Performance Testing: Tests of E3SM on

...

Anvil

Date last modified:

...

30 July 2019
Contributors: Balwinder Singh


To measure performance of CLUBBV2, two 5 days simulations (grid:ne30_ne30, Compset: FC5AV1C-L) were run on Anvil using Intel compiler. Following are the timings:

...