Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • 250m source DEM to cubed topo failed due to OOM. It requires ~638G to cube48000 (200m), ~507G to cube40000 (250m), ~316G to cube24000 (400m), not enough for both LC and perlmutter.

...