Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

(tick)
Action RequiredAssignee - Task OwnerLinkDone ?Done DateApproved?ApproverApproved DateNotes
Phase 1 - Component Level Development and Testing
Design DocumentPhilip Cameron-Smith (Unlicensed)A1 Ozone Hole: Design Document

(tick)

  

 

(tick)

Shaocheng Xie  
Verification and Unit TestsPhilip Cameron-Smith (Unlicensed)A1 Ozone Hole: Verification Phase 1(tick) 

(tick)

 

Phil Rasch (pnl.gov)   
Performance AssessmentPhilip Cameron-Smith (Unlicensed) A1 Ozone Hole: Performance Phase 1(tick) (error)(tick) Shaocheng Xie  
Validation TestsPhilip Cameron-Smith (Unlicensed) A1 Ozone Hole: Validation Phase 1(tick) (error)(tick) Shaocheng Xie  
Issue Pull RequestPhilip Cameron-Smith (Unlicensed)#406(tick) (error)(tick) Shaocheng Xie  
PR IntegratorSusannah Burrows- integrated date----
Phase 2 - Coupled System Integration and Testing
Phase 2 Process Doc(error)(error)  
Feature's Coupled Performance(error)(error)   
Feature's Coupled Validation(error)(error)   
Final Approval to part of ACME model (error)----

...