This page should describe Verification and Unit Tests performed for this stand alone feature and should provide links to all the result pages.

Table of Contents

Summary

Short summary of what was done and what was the result.Linoz has been published (see A1 Ozone Hole: Design Document), and the code has been used by multiple modeling groups for several years, including at LLNL and NCAR, and was accepted by the CESM chemistry-climate working group and been released as part of CESM.   Hence the algorithms and code-base are already well established.   Thus, the risk is deemed to be minimal, so verification and unit-testing are not deemed to be worth the time investment for v1.  

A unit-testing capability with inbuilt verification would be desirable for the future. 