Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...


Action RequiredAssignee - Task OwnerLinkDone ?Done DateApproved?ApproverApproved DateNotes
Phase 1 - Component Level Development and Testing
Design DocumentMichael BrunkeB8 Variable soil thickness in CTC Design Document(tick)18 March 2020 

(tick)

Katherine Calvin (Unlicensed) 
Verification and Unit TestsMichael BrunkeB8 Variable soil thickness in CTC Verification Phase 1(tick)27 April 2020(error)(tick)Katherine Calvin (Unlicensed) 
Performance AssessmentMichael BrunkeB8 Variable soil thickness in CTC Performance(tick)27 April 2020(tick)Katherine Calvin (Unlicensed) 
Validation TestsMichael BrunkeB8 Variable soil thickness in CTC Validation(tick)21 August 2020(error)


Issue Pull RequestMichael Brunke#3609(tick)24 August 2020(error)


PR Integratorassigned integrator-
integrated date----
Phase 2 - Coupled System Integration and Testing
Phase 2 Process Doc(error)(error)

Feature's Coupled Performance(error)(error)


Feature's Coupled Validation(error)(error)


Final Approval to part of ACME model
(error)----